Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Glyndwr University
Plas Coch, Mold Road
Wrexham
LL11 2AW
UK
Ffôn: +44 1978293188
E-bost: a.staples@glyndwr.ac.uk
Ffacs: +44 1978293188
NUTS: UKL23
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://www.glyndwr.ac.uk
Cyfeiriad proffil y prynwr: https://www.sell2wales.gov.wales/search/Search_AuthProfile.aspx?ID=AA0288
I.4) Y math o awdurdod contractio
Arall: University
I.5) Prif weithgaredd
Addysg
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Design & Build of a New Enterprise Engineering and Optics Centre (EEOC), Plas Coch Campus, Wrexham
Cyfeirnod: AS/SD/10/02/2023
II.1.2) Prif god CPV
45214400
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
This project, the Enterprise Engineering and Optics Centre (EEOC), is a key project to be delivered as part of the North Wales Growth Deal (now Ambition North Wales).The Growth Deal is a partnership between the public sector and the private sector, supported by funding from UK Government and Welsh Government.
The Growth Deal builds on the Growth Vision for North Wales, adopted in 2016: “a confident, cohesive region with sustainable economic growth, capitalising on the success of high value economic sectors and our connection to the economies of the Northern Powerhouse & Ireland.”
The budget for this Design & Build contract was 8.350m GBP(exclusive of VAT),10.02m GBP(including VAT). The estimated build cost was 7.5m GBP(excluding VAT),9.0m GBP(including VAT). The Actual PCSA stage cost is 235,799.50 GBP (excluding VAT), with the total cost for the Design & Build stages being 8,202,568 GBP (excluding VAT).
The main Works building project has been be procured using a two-stage Design and Build approach with a JCT Pre-Construction Services Agreement (PCSA) as well as a JCT D&B 2016 Full Form of contract.
The scope of the works include:
Carry out design process for a new 2,187m2 building at Wrexham and produce costs and all other necessary information to reach financial close
Demolish two small sections of the adjacent engineering building to facilitate the new build
Construct a new low carbon building with net zero operational carbon
Install incoming cables and other services and potentially install PV panels on buildings to meet the operational next zero targets
Move engineering equipment from adjacent buildings, and from St Asaph and Broughton sites, and commission to bring the building operational
The indicative targeted contract dates will commence from 6th June 2023 until 24th October 2023 for the Pre-Construction Services Agreement (PCSA) stage. The Design & Build contract is estimated to commence in November / December 2023 with construction build to start on site no later than 19th of February 2024.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Gwerth heb gynnwys TAW: 8 202 568.00 GBP
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
45000000
45210000
45212340
45214300
45214400
45214600
45214620
71200000
71220000
II.2.3) Man cyflawni
Cod NUTS:
UKL23
Prif safle neu fan cyflawni:
Wrexham, LL11 2AW
II.2.4) Disgrifiad o’r caffaeliad
The University has procured a contract for Design & Build of a New Enterprise Engineering and Optics Centre (EEOC).
The Contract Notice has been advertised on the Sell2Wales & Find a Tender Service (FTS)websites and the process has been conducted under the Open Procedure of the Public Contracts Regulations 2015 (PCR).
The main Works building project was procured using a two-stage Design and Build approach with a JCT Pre-Construction Services Agreement (PCSA) as well as a JCT D&B 2016 Full Form of contract.
The procurement process ended on 26th May 2023 with the award of the Pre Construction Services Agreement (PCSA).
Following the completion of the PCSA stage by no later than 24th October 2023,the EEOC project will proceed to Full Business Case (FBC) approval in November 2023.The project will quickly then progress to delivery stage, with the start on site scheduled for no later than 19th February 2024.
For the purpose of the procurement process, this will either result in the second stage as outlined above or a new standalone procurement process being conducted, since the University reserves the right not to proceed to sign a Build Contract with the awarded contractor appointed at the PCSA stage, and where this is the case a new tender exercise would need to be undertaken.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Project Delivery Team
/ Pwysoliad: 15
Maes prawf ansawdd: Pre-Construction Services Agreement (PCSA stage) project management
/ Pwysoliad: 30
Maes prawf ansawdd: Carbon Net Zero & Biodiversity
/ Pwysoliad: 10
Maes prawf ansawdd: Construction Phase Project Management
/ Pwysoliad: 30
Maes prawf ansawdd: Environmental & Sustainability Considerations
/ Pwysoliad: 3
Maes prawf ansawdd: Risk Management
/ Pwysoliad: 8
Maes prawf ansawdd: Fair Work Practices
/ Pwysoliad: 2
Maes prawf ansawdd: Interview
/ Pwysoliad: 2
Maes prawf ansawdd: Quality Overall
/ Pwysoliad: 40
Maes prawf ansawdd: Social Value Overall
/ Pwysoliad: 15
Price
/ Pwysoliad:
45% Overall
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2023/S 000-006481
Section V: Dyfarnu contract
Rhif Contract: AS/SD/10/02/2023
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
06/06/2023
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 3
Nifer y tendrau a ddaeth i law gan BBaChau: 3
Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau yr UE: 0
Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau nad ydynt yn aelodau o'r UE: 3
Nifer y tendrau a ddaeth i law drwy ddulliau electronig: 3
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
C.WYNNE & SONS LTD T/A WYNNE CONSTRUCTION
C.WYNNE & SONS LTD, Charles House ABERGELE ROAD
RHYL
LL185TY
UK
Ffôn: +44 1745586666
NUTS: UK
BBaCh yw’r contractwr:
Ydy
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 8 350 000.00 GBP
Cyfanswm gwerth y contract/lot: 8 202 568.00 GBP
V.2.5) Gwybodaeth am is-gontractio
Mae’n debygol y caiff y contract ei is-gontractio
Y gwerth neu gyfran sy’n debygol o gael ei (h)is-gontractio i drydydd partïon
Gwerth heb gynnwys TAW: 6 460 000.00 GBP
Cyfran: 80 %
Disgrifiad byr o’r rhan o’r contract i’w his-gontractio:
Design disciplines, investigations and survey works
Groundworks, comprising substructure, drainage, external works
Structural Steelwork
Cladding
Curtain Walling, Windows & External Doors
Internal Walls, Partitions & Ceilings
Internal Doors
Floor Finishes
Painting & Decoration
Fittings, Furnishings and Equipment
Mechanical & Electrical Services
Paving & Surfacing
Fencing, Railings & Gates
Soft Landscaping & Planting
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
The Overall Award Criteria for this procurement was based on 45% Price, 40% Quality and 15% Social Value.
The initial contract entered into is for a Pre-Construction Services Agreement (PCSA) and a Build contract will be entered into as a second stage contract subject to affordability.
(WA Ref:132523)
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
High Court
Royal Courts of Justice, The Strand
London
WC2A 2LL
UK
Ffôn: +44 2079477501
VI.5) Dyddiad anfon yr hysbysiad hwn
22/06/2023