Hysbysiad gwybodaeth ymlaen llaw
Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
London Borough of Lewisham
4th Floor Laurence House
Catford
SE6 4RU
UK
Person cyswllt: Mr Shyamsundar Ramu Dilli Babu
Ffôn: +44 203
E-bost: shyamsundar.ramudillibabu@lewisham.gov.uk
NUTS: UKI44
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://www.lewisham.gov.uk
Cyfeiriad proffil y prynwr: https://www.londontenders.org/
I.3) Cyfathrebu
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Lewisham Library Refurbishment - PIN
II.1.2) Prif god CPV
45000000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
The London Borough of Lewisham are looking to procure a suitably experienced Main Contractor to deliver the major, Government Levelling Up funded (LUF) refurbishment of the Council-owned Lewisham Library (199 – 201 Lewisham High St, SE13 6LG) to provide a new flagship Culture and Business Hub. The renovations will include improved library, heritage, and archive spaces; community space; a business hub, meeting rooms and workspaces; and an improved hospitality facility.
Planning permission for the proposed works was granted in September 2024. Further information can be found on the Lewisham Council online planning portal (https://planning.lewisham.gov.uk) reference DC/24/136933.
The refurbishment works consist of but not limited to:
• Asbestos removal and necessary remediation works
• Removal of disused internal escalator
• Structural reinforcement to third floor
• New insulated flat roof
• New insulated external cladding
• New windows and curtain walling
• New HVAC, small power, lighting, data, plumbing, security, and life safety systems
• New roof-mounted ASHP & PV panels
• Replacement of existing passenger lift and refurbishment of existing goods lift
• Internal layout reconfiguration including new solid & glazed partitions and doors
• New central stair
• Replacement of existing toilets and new café
• New internal finishes, flooring, ceilings, and decoration
• Bespoke joinery and Fixed FF&E
• New IT infrastructure
Contract period:
Anticipated 12-14 months construction starting March 2025, with a further 12 months’ defect rectification period.
Procurement process:
The contract will be procured by a Single Stage open tender process, assessed 45% Cost, 45% Quality, 10% Social Value, leading to the appointment of a contractor under JCT Standard Contract with Contractor Design Portion. This tender is due to be advertised late November 2024
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKI44
II.2.4) Disgrifiad o’r caffaeliad
The London Borough of Lewisham are looking to procure a suitably experienced Main Contractor to deliver the major, Government Levelling Up funded (LUF) refurbishment of the Council-owned Lewisham Library (199 – 201 Lewisham High St, SE13 6LG) to provide a new flagship Culture and Business Hub. The renovations will include improved library, heritage, and archive spaces; community space; a business hub, meeting rooms and workspaces; and an improved hospitality facility.
Planning permission for the proposed works was granted in September 2024. Further information can be found on the Lewisham Council online planning portal (https://planning.lewisham.gov.uk) reference DC/24/136933.
The refurbishment works consist of but not limited to:
• Asbestos removal and necessary remediation works
• Removal of disused internal escalator
• Structural reinforcement to third floor
• New insulated flat roof
• New insulated external cladding
• New windows and curtain walling
• New HVAC, small power, lighting, data, plumbing, security, and life safety systems
• New roof-mounted ASHP & PV panels
• Replacement of existing passenger lift and refurbishment of existing goods lift
• Internal layout reconfiguration including new solid & glazed partitions and doors
• New central stair
• Replacement of existing toilets and new café
• New internal finishes, flooring, ceilings, and decoration
• Bespoke joinery and Fixed FF&E
• New IT infrastructure
Contract period:
Anticipated 12-14 months construction starting March 2025, with a further 12 months’ defect rectification period.
Procurement process:
The contract will be procured by a Single Stage open tender process, assessed 45% Cost, 45% Quality, 10% Social Value, leading to the appointment of a contractor under JCT Standard Contract with Contractor Design Portion. This tender is due to be advertised late November 2024
II.2.14) Gwybodaeth ychwanegol
The tender opportunity will be advertised on the London Tenders Portal. https://www.londontenders.org/
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
18/11/2024
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Lewisham Library Refurbishment - PIN
II.1.2) Prif god CPV
45000000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
The London Borough of Lewisham are looking to procure a suitably experienced Main Contractor to deliver the major, Government Levelling Up funded (LUF) refurbishment of the Council-owned Lewisham Library (199 – 201 Lewisham High St, SE13 6LG) to provide a new flagship Culture and Business Hub. The renovations will include improved library, heritage, and archive spaces; community space; a business hub, meeting rooms and workspaces; and an improved hospitality facility.
Planning permission for the proposed works was granted in September 2024. Further information can be found on the Lewisham Council online planning portal (https://planning.lewisham.gov.uk) reference DC/24/136933.
The refurbishment works consist of but not limited to:
• Asbestos removal and necessary remediation works
• Removal of disused internal escalator
• Structural reinforcement to third floor
• New insulated flat roof
• New insulated external cladding
• New windows and curtain walling
• New HVAC, small power, lighting, data, plumbing, security, and life safety systems
• New roof-mounted ASHP & PV panels
• Replacement of existing passenger lift and refurbishment of existing goods lift
• Internal layout reconfiguration including new solid & glazed partitions and doors
• New central stair
• Replacement of existing toilets and new café
• New internal finishes, flooring, ceilings, and decoration
• Bespoke joinery and Fixed FF&E
• New IT infrastructure
Contract period:
Anticipated 12-14 months construction starting March 2025, with a further 12 months’ defect rectification period.
Procurement process:
The contract will be procured by a Single Stage open tender process, assessed 45% Cost, 45% Quality, 10% Social Value, leading to the appointment of a contractor under JCT Standard Contract with Contractor Design Portion. This tender is due to be advertised late November 2024
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKI44
II.2.4) Disgrifiad o’r caffaeliad
The London Borough of Lewisham are looking to procure a suitably experienced Main Contractor to deliver the major, Government Levelling Up funded (LUF) refurbishment of the Council-owned Lewisham Library (199 – 201 Lewisham High St, SE13 6LG) to provide a new flagship Culture and Business Hub. The renovations will include improved library, heritage, and archive spaces; community space; a business hub, meeting rooms and workspaces; and an improved hospitality facility.
Planning permission for the proposed works was granted in September 2024. Further information can be found on the Lewisham Council online planning portal (https://planning.lewisham.gov.uk) reference DC/24/136933.
The refurbishment works consist of but not limited to:
• Asbestos removal and necessary remediation works
• Removal of disused internal escalator
• Structural reinforcement to third floor
• New insulated flat roof
• New insulated external cladding
• New windows and curtain walling
• New HVAC, small power, lighting, data, plumbing, security, and life safety systems
• New roof-mounted ASHP & PV panels
• Replacement of existing passenger lift and refurbishment of existing goods lift
• Internal layout reconfiguration including new solid & glazed partitions and doors
• New central stair
• Replacement of existing toilets and new café
• New internal finishes, flooring, ceilings, and decoration
• Bespoke joinery and Fixed FF&E
• New IT infrastructure
Contract period:
Anticipated 12-14 months construction starting March 2025, with a further 12 months’ defect rectification period.
Procurement process:
The contract will be procured by a Single Stage open tender process, assessed 45% Cost, 45% Quality, 10% Social Value, leading to the appointment of a contractor under JCT Standard Contract with Contractor Design Portion. This tender is due to be advertised late November 2024
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
18/11/2024
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
Section VI: Gwybodaeth ategol
VI.5) Dyddiad anfon yr hysbysiad hwn
18/10/2024