Hysbysiad dangosol cyfnodol - cyfleustodau
Hysbysiad dangosol cyfnodol yn unig yw'r hysbysiad hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
AFFINITY WATER LIMITED
02546950
Tamblin Way
HATFIELD
AL109EZ
UK
E-bost: tenders@affinitywater.co.uk
NUTS: UKH23
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.affinitywater.co.uk
Cyfeiriad proffil y prynwr: https://www.affinitywater.co.uk
I.3) Cyfathrebu
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
I.6) Prif weithgaredd
Dŵr
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
AMPs 8 & 9 Capital Works
Cyfeirnod: C-04110
II.1.2) Prif god CPV
45000000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Affinity Water is preparing to go to tender to have a supply chain to deliver the AMP8 and 9 capital works. The AMP8 and 9 regulatory period will run from April 2025 to March 2035. The estimated total value of AMP8 is £450,000,000 and a similar amount for AMP9. The let agreements will run alongside other existing agreements (that will be used to deliver the AMP8 and 9 programmes) which are outside the scope of works and services included in this PIN. Examples include the Smart Metering Programme.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 900 000 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Ydy
II.2) Disgrifiad
Rhif y Lot 1
II.2.1) Teitl
Infra (BGA) capital works
II.2.2) Cod(au) CPV ychwanegol
44161200
44162500
45200000
50411100
65100000
71000000
79415200
II.2.3) Man cyflawni
Cod NUTS:
UKH
UKI
UKJ
II.2.4) Disgrifiad o’r caffaeliad
Infra (BGA) capital works include activities such as:
• Distribution mains renewals
• Trunk main renewals
• Network reinforcements
• Under pressure connections/line stops
• Water mains commissioning
• Street works
• Developer services activities - including new connections and water mains diversions
• Network modelling and network data management
• Network calming
• MEICA for distribution assets
• Retrofitting of advanced pressure management solutions.
II.2.14) Gwybodaeth ychwanegol
A preliminary market consultation event is planned to take place on 17/10/2023. See VI.3 below.
Rhif y Lot 2
II.2.1) Teitl
Non-infra (AGA) capital works
II.2.2) Cod(au) CPV ychwanegol
44161200
44162500
45200000
50411100
65100000
71000000
79415200
II.2.3) Man cyflawni
Cod NUTS:
UKH
UKI
UKJ
II.2.4) Disgrifiad o’r caffaeliad
Non-infra (AGA) capital works include activities such as:
• Design, build and commissioning of water treatment processes - including civils, Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) and process design.
• Design, build and commissioning of booster pumping stations, design, build and commissioning of service reservoirs - including of similar structures such as clean water tanks.
• Integration of assets - including automation/control of the strategic network.
II.2.14) Gwybodaeth ychwanegol
A preliminary market consultation event is planned to take place on 17/10/2023. See VI.3 below.
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
01/11/2023
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
A market launch event will take place on 17/10/2023. Affinity Water welcomes interest and feedback from all sections of the market, including from suppliers that do not traditionally operate in the Water Industry. Affinity Water will be willing to work with those suppliers if successful. To register your interest for the launch event, please contact tenders@affinitywater.co.uk with 'C-04110 your company name' in the title. The e-mail is to include your company name, registered no, area of expertise and contact details. Attendance is both subject to availability and is strictly restricted to 2 attendees per organisation. Lunch will be provided. Interested parties should also outline any specific dietary or accessibility requirements.
VI.5) Dyddiad anfon yr hysbysiad hwn
05/10/2023