Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad o Gontract

Framework for Accelerated Adaptations

  • Cyhoeddwyd gyntaf: 13 Tachwedd 2024
  • Wedi'i addasu ddiwethaf: 13 Tachwedd 2024

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-145911
Cyhoeddwyd gan:
Cardiff Council
ID Awudurdod:
AA0422
Dyddiad cyhoeddi:
13 Tachwedd 2024
Dyddiad Cau:
13 Rhagfyr 2024
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

The tender has been issued by the Council in connection with a competitive procurement that is being conducted in accordance with the Restricted Procedure under the Public Contracts Regulations 2015. The Disabled Facilities Service is a reactive service that administers cases as soon as they are received. This Framework intends to meet the demand from hospitals (to expedite a discharge to home) and those ‘other’ cases where a rapid response is required. The successful Contractor will be expected to deliver quality works and meet the challenging Performance Indicators that have been set. It should be noted that all work types are to be completed in domestic properties and will include various construction property types such as: traditional brick and block constructed properties, system built properties (including PRC and BISF property types), high rise, sheltered accommodation, stone and timber framed properties et al. Work (Domestic only) to include: • Completion of domestic property surveys and creating a comprehensive schedule of works (with an agreed schedule of rates) to meet the needs of the individual as identified in the occupational therapist report. • Converting existing rooms to provide accessible bathing facilities (to include all associated works) i.e. level access shower facilities, wet rooms (to include bathrooms above an on-ground floor). • Provision of straight stair-lifts appropriate to the property construction type, to meet the needs of the applicant. • General works to include; provision of modular ramping and steps; structural alterations to provide access into and around a property; repair works associated with the adaptation. The majority of works will be covered by the agreed Schedule of Rates, however, occasionally there may be works that are not covered in the Schedule of Rates. Where an item is not included in the Schedule of Rates, the Employer will refer to a recognised / industry standard price book such as ‘BCIS’ (or similar) to identify that item and apply the prevailing rate(s). Where an item is not included in the Schedule of Rates nor covered by a recognised / industry standard price book such as “BCIS” (or similar); then the uplift to be applied by the Contractor will be not exceed 10% or £500 (whichever is lower). Whilst the scope of works will primarily be as indicated in the above bullet points, occasionally there may be a requirement for ‘larger type’ works, such as, conversion of an existing room, external works to provide access, provision of an extension to a property, replacement of/or repairs to, structural elements of the property including the roof. It is anticipated that the volume of these ‘larger type’ works will be minimal and if not covered by the SOR, Contractors may be given the opportunity to provide a price. The following is an estimated breakdown of the different activities that may form part of the 57 jobs ( please refer to the tender documentation for the anticipated volumes (per contractor and total)). - Ramps - Pumped Waste - UPVC level threshold doors - Shower Seats - Grab-rails - Drop Down Rails - Shower Trays - Door widening - Convert/upgrade outhouse - Straight stair-lift - Single rail ceiling track hoist Bidders should note that the maximum number of contractors to be appointed to this framework is 6. However, should a lesser number of contractors be appointed, subject to satisfactory performance, the value of the works may be split by rotation between the appointed contractors. Estimated annual jobs per contractor: 57 Estimated Average Value per job per contractor: £7,000.00 Estimated Annual Value per contractor: £400k The Council intends to enter a Framework Agreement with up to six Contractors for a period of 2 years with an option to extend for up to a further 2 years. In the event that the Council decides to source works through the Framework Agreement, then it will do so in accordance with the contract terms and conditions, i

Testun llawn y rhybydd

HYSBYSIAD O GONTRACT - CENEDLAETHOL

WORKS

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Cardiff Council

County Hall, Atlantic Wharf,

Cardiff

CF10 4UW

UK

Beverley Davies

+44 2920873732

bmfw@cardiff.gov.uk

https://www.cardiff.gov.uk

1.2

Cyfeiriad ar gyfer cael dogfennaeth

Fel yn I.1

1.3

Mae'n rhaid dychwelyd dogfennau wedi'u cwblhau at:

Fel yn I.1

2 Manylion y Contract

2.1

Teitl

Framework for Accelerated Adaptations

2.2

Disgrifiad o'r nwyddau neu'r gwasanaethau sydd eu hangen

The tender has been issued by the Council in connection with a competitive procurement that is being conducted in accordance with the Restricted Procedure under the Public Contracts Regulations 2015.

The Disabled Facilities Service is a reactive service that administers cases as soon as they are received. This Framework intends to meet the demand from hospitals (to expedite a discharge to home) and those ‘other’ cases where a rapid response is required. The successful Contractor will be expected to deliver quality works and meet the challenging Performance Indicators that have been set.

It should be noted that all work types are to be completed in domestic properties and will include various construction property types such as: traditional brick and block constructed properties, system built properties (including PRC and BISF property types), high rise, sheltered accommodation, stone and timber framed properties et al.

Work (Domestic only) to include:

• Completion of domestic property surveys and creating a comprehensive schedule of works (with an agreed schedule of rates) to meet the needs of the individual as identified in the occupational therapist report.

• Converting existing rooms to provide accessible bathing facilities (to include all associated works) i.e. level access shower facilities, wet rooms (to include bathrooms above an on-ground floor).

• Provision of straight stair-lifts appropriate to the property construction type, to meet the needs of the applicant.

• General works to include; provision of modular ramping and steps; structural alterations to provide access into and around a property; repair works associated with the adaptation.

The majority of works will be covered by the agreed Schedule of Rates, however, occasionally there may be works that are not covered in the Schedule of Rates. Where an item is not included in the Schedule of Rates, the Employer will refer to a recognised / industry standard price book such as ‘BCIS’ (or similar) to identify that item and apply the prevailing rate(s). Where an item is not included in the Schedule of Rates nor covered by a recognised / industry standard price book such as “BCIS” (or similar); then the uplift to be applied by the Contractor will be not exceed 10% or £500 (whichever is lower).

Whilst the scope of works will primarily be as indicated in the above bullet points, occasionally there may be a requirement for ‘larger type’ works, such as, conversion of an existing room, external works to provide access, provision of an extension to a property, replacement of/or repairs to, structural elements of the property including the roof. It is anticipated that the volume of these ‘larger type’ works will be minimal and if not covered by the SOR, Contractors may be given the opportunity to provide a price.

The following is an estimated breakdown of the different activities that may form part of the 57 jobs ( please refer to the tender documentation for the anticipated volumes (per contractor and total)).

- Ramps

- Pumped Waste

- UPVC level threshold doors

- Shower Seats

- Grab-rails

- Drop Down Rails

- Shower Trays

- Door widening

- Convert/upgrade outhouse

- Straight stair-lift

- Single rail ceiling track hoist

Bidders should note that the maximum number of contractors to be appointed to this framework is 6. However, should a lesser number of contractors be appointed, subject to satisfactory performance, the value of the works may be split by rotation between the appointed contractors.

Estimated annual jobs per contractor: 57

Estimated Average Value per job per contractor: £7,000.00

Estimated Annual Value per contractor: £400k

The Council intends to enter a Framework Agreement with up to six Contractors for a period of 2 years with an option to extend for up to a further 2 years.

In the event that the Council decides to source works through the Framework Agreement, then it will do so in accordance with the contract terms and conditions, i.e. the Framework Agreement and relevant schedules (and appendices to the same) that will form part of the ITT. These contract terms and conditions will provide that the Council will source its requirements in accordance with the following approach:

The Council will award on a rotational basis (order 1 to contractor 1, order 2 to contractor 2, order 3 to contractor 3, order 4 to contractor 4, order 5 to contractor 5, order 6 to contractor 6) unless in the event there are capacity or non-performance issues, then the Council may skip the contractor with capacity or non-performance issues from the rotation.

The Council intends to enter a Framework Agreement with up to six Contractors for a period of 2 years, with the option to extend for up to a further 2 years.

2.3

Cod a Dosbarthiad yr Hysbysiad

34953000 Access ramps
39144000 Bathroom furniture
39151300 Modular furniture
44115600 Stairlifts
44411400 Shower basins
45000000 Construction work
45211100 Construction work for houses
45211310 Bathrooms construction work
45215000 Construction work for buildings relating to health and social services, for crematoriums and public conveniences
45215100 Construction work for buildings relating to health
45234230 Construction work for chair lifts
45453100 Refurbishment work
75313000 Disability benefits
1022 Cardiff and Vale of Glamorgan

2.4

Cyfanswm maint neu gwmpas y tendr

Estimated annual jobs per contractor: 57

Estimated Average Value per job per contractor: £7,000.00

Estimated Annual Value per contractor: £400k

The Council intends to enter a Framework Agreement with up to six Contractors for a period of 2 years with an option to extend for up to a further 2 years.

In the event that the Council decides to source works through the Framework Agreement, then it will do so in accordance with the contract terms and conditions, i.e. the Framework Agreement and relevant schedules (and appendices to the same) that will form part of the ITT. These contract terms and conditions will provide that the Council will source its requirements in accordance with the following approach:

The Council will award on a rotational basis (order 1 to contractor 1, order 2 to contractor 2, order 3 to contractor 3, order 4 to contractor 4, order 5 to contractor 5, order 6 to contractor 6) unless in the event there are capacity or non-performance issues, then the Council may skip the contractor with capacity or non-performance issues from the rotation.

The Council intends to enter a Framework Agreement with up to six Contractors for a period of 2 years, with the option to extend for up to a further 2 years.

3 Amodau ar gyfer Cymryd Rhan

3.1

Safonau gofynnol a'r cymhwyster sydd ei angen

Please refer to the tender documentation.

4 Gwybodaeth Weinyddol

4.1

Math o Weithdrefn

Dau gam

4.2

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

ERFX1008549

4.3

Terfynau Amser



Dyddiad Cau ar gyfer ceisiadau i gymryd rhan
     13 - 12 - 2024  Amser   12:00

Anfon gwahoddiadau i dendro   15 - 01 - 2025

Dyddiad dyfarnu amcangyfrifedig   19 - 02 - 2025

4.5

Yr iaith neu'r ieithoedd y gellir ei/eu defnyddio i lunio tendrau neu geisiadau i gymryd rhan

EN   CY  

4.6

Blwch Postio Cyflwyno Tendrau

5 Gwybodaeth Arall

5.1

Gwybodaeth Ychwanegol

Please refer to the tender documents that can be found on the Proactis Portal under reference ERFX1008549.

https://supplierlive.proactisp2p.com/account/login

The Council reserves the right to appoint a replacement contractor in the event of either the Contractors initially being appointed withdrawing from the Framework Agreement, or in the event that the Council terminates the agreement with either of the Contractors initially appointed.

(WA Ref:145911)

The buyer considers that this contract is suitable for consortia bidding.

5.2

Dogfennaeth Ychwanegol

5.3

Dyddiad cyhoeddi'r hysbysiad hwn

  13 - 11 - 2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
44411400 Basnau cawod Offer ymolchfa
75313000 Budd-daliadau anabledd Gwasanaethau budd-daliadau
39151300 Dodrefn modiwlaidd Dodrefn amrywiol
39144000 Dodrefn ystafell ymolchi Dodrefn domestig
45000000 Gwaith adeiladu Adeiladu ac Eiddo Tiriog
45215100 Gwaith adeiladu ar gyfer adeiladau sy’n gysylltiedig ag iechyd Gwaith adeiladu ar gyfer adeiladau sy’n gysylltiedig ag iechyd a gwasanaethau cymdeithasol, ar gyfer amlosgfeydd a chyfleusterau cyhoeddus
45215000 Gwaith adeiladu ar gyfer adeiladau sy’n gysylltiedig ag iechyd a gwasanaethau cymdeithasol, ar gyfer amlosgfeydd a chyfleusterau cyhoeddus Gwaith adeiladu adeiladau
45234230 Gwaith adeiladu ar gyfer cadeiriau codi Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau
45211100 Gwaith adeiladu ar gyfer tai Gwaith adeiladu ar gyfer adeiladau aml-annedd a thai unigol
45211310 Gwaith adeiladu ystafelloedd ymolchi Gwaith adeiladu ar gyfer adeiladau aml-annedd a thai unigol
45453100 Gwaith adnewyddu Gwaith atgyweirio ac ailwampio
44115600 Lifftiau grisiau Ffitiadau adeiladau
34953000 Rampiau mynediad Gwasanaethau dylunio strwythurau cynnal pwysau

Lleoliadau Dosbarthu

ID Disgrifiad
1022 Caerdydd a Bro Morgannwg

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
bmfw@cardiff.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.