Hysbysiad o Gontract

For the provision of Design, Remediation and Construction Works for Barrow Waterfront, Barrow

  • Cyhoeddwyd gyntaf: 28 Mawrth 2024
  • Wedi'i addasu ddiwethaf: 28 Mawrth 2024
  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Rydych yn gweld hysbysiad sydd wedi dod i ben.

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-044d6d
Cyhoeddwyd gan:
Westmorland and Furness Council
ID Awudurdod:
AA83929
Dyddiad cyhoeddi:
28 Mawrth 2024
Dyddiad Cau:
01 Mai 2024
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

This Tender concerns Phase Two of Marina Village. The Council wishes to appoint a design and build contractor to remediate the site to broadly the same standard as Phase 1 and to install some associated enabling infrastructure on the site to assist future housing suppliers to develop the site for 808 homes (Phase 1 and Phase 2 together). Please refer to the Scope for further information.

Contractual Context

(a) This ITT is for a two staged procurement to identify a Contractor to undertake the Works identified in the Schedule 2 (Scope relating to the design and remediation/construction of the Barrow Waterfront Phase Two site in Barrow, Cumbria).

(b) The 2 stages are:

• Stage 1: Design Services (including, but not limited to surveys, investigations, reporting, planning, communications and costings) within an NEC4 Option A Engineering and Construction Contract (ECC).

• Stage 2: Construction Works (delivery of the remediation strategy and infrastructure designs as agreed at the end of Stage 1) within an NEC4 Option A Engineering and Construction Contract (ECC).

(c) For Stage 1, the Contractor will enter into a NEC4 Option A Engineering and Construction Contract (ECC) with the Council (Client) and undertake the services outlined in the Scope.

(d) The Contractor will, as part of the Scope of Stage 1, undertake any necessary supplementary investigations, studies, assessments, etc., produce all drawings and specification for the works; and secure all necessary consents and approvals. The Contractor will, among other things, provide a pre-construction information (PCI) document as well as an updated priced activity schedule for discussion and acceptance at the end of Stage 1. For further Details please refer to the Scope.

(e) If the Client accepts the Stage 1 design and price, the Contractor will be asked to provide the Stage 2 works by entering into a Stage 2 Engineering and Construction Contract with the Client.

(f) For the avoidance of doubt, the initial contract will be for the provision of Stage 1 only. The Client has no contractual obligation to commit to entering into the Stage 2 Engineering and Construction Contract and at its sole discretion may seek to end or reprocure the project at the end of Stage 1.

Testun llawn y rhybydd

Hysbysiad contract

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Westmorland and Furness Council

South Lakeland House, Lowther Street

Kendal

LA9 4DQ

UK

Person cyswllt: Ms Gwyneth Timson

Ffôn: +44 1768212268

E-bost: procurement2@westmorlandandfurness.gov.uk

NUTS: UKD12

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://www.westmorlandandfurness.gov.uk/

Cyfeiriad proffil y prynwr: https://www.westmorlandandfurness.gov.uk/

I.3) Cyfathrebu

Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:

https://www.the-chest.org.uk/


Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:

https://www.the-chest.org.uk/


I.4) Y math o awdurdod contractio

Awdurdod rhanbarthol neu leol

I.5) Prif weithgaredd

Gwasanaethau cyhoeddus cyffredinol

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

For the provision of Design, Remediation and Construction Works for Barrow Waterfront, Barrow

Cyfeirnod: DN717053

II.1.2) Prif god CPV

45000000

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

This Tender concerns Phase Two of Marina Village. The Council wishes to appoint a design and build contractor to remediate the site to broadly the same standard as Phase 1 and to install some associated enabling infrastructure on the site to assist future housing suppliers to develop the site for 808 homes (Phase 1 and Phase 2 together). Please refer to the Scope for further information.

Contractual Context

(a) This ITT is for a two staged procurement to identify a Contractor to undertake the Works identified in the Schedule 2 (Scope relating to the design and remediation/construction of the Barrow Waterfront Phase Two site in Barrow, Cumbria).

(b) The 2 stages are:

• Stage 1: Design Services (including, but not limited to surveys, investigations, reporting, planning, communications and costings) within an NEC4 Option A Engineering and Construction Contract (ECC).

• Stage 2: Construction Works (delivery of the remediation strategy and infrastructure designs as agreed at the end of Stage 1) within an NEC4 Option A Engineering and Construction Contract (ECC).

(c) For Stage 1, the Contractor will enter into a NEC4 Option A Engineering and Construction Contract (ECC) with the Council (Client) and undertake the services outlined in the Scope.

(d) The Contractor will, as part of the Scope of Stage 1, undertake any necessary supplementary investigations, studies, assessments, etc., produce all drawings and specification for the works; and secure all necessary consents and approvals. The Contractor will, among other things, provide a pre-construction information (PCI) document as well as an updated priced activity schedule for discussion and acceptance at the end of Stage 1. For further Details please refer to the Scope.

(e) If the Client accepts the Stage 1 design and price, the Contractor will be asked to provide the Stage 2 works by entering into a Stage 2 Engineering and Construction Contract with the Client.

(f) For the avoidance of doubt, the initial contract will be for the provision of Stage 1 only. The Client has no contractual obligation to commit to entering into the Stage 2 Engineering and Construction Contract and at its sole discretion may seek to end or reprocure the project at the end of Stage 1.

II.1.5) Cyfanswm gwerth amcangyfrifedig

Gwerth heb gynnwys TAW: 16 000 000.00 GBP

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.3) Man cyflawni

Cod NUTS:

UKD12

II.2.4) Disgrifiad o’r caffaeliad

(a) Site Background

Barrow Waterfront (historically known as Marina Village) is a 25-hectare brownfield site in Barrow-in-Furness on the north side of Buccleuch Dock (Site). The Site currently consists of an area of unused open scrubland within the central area of the site. Towards the northwest of the Site, there are commercial premises around Cavendish Dock Road and hardstanding areas along the northern boundary with Salthouse Road.

The adopted Barrow Borough Local Plan identifies this Site as a strategic housing allocation and is one of the largest housing sites within the new Westmorland and Furness Authority.

The Site is in a prominent location, situated close to the town centre and major employment sites such as BAE Systems located on Barrow Island, the Waterfront Business Park and the Port of Barrow.

Almost all of the Site is in Westmorland and Furness Council’s ownership; however, as noted above, a small number of land parcels are in private ownership and negotiations with the third-party landowners are currently in progress with the aim of securing the acquisition of these by agreement.

Most of the Site was originally claimed from tidal flat deposits in the mid-19th century by upfilling, reportedly using dredged material from Walney Channel, during the construction of the adjacent dock system. The Site was subsequently developed as railway land, with railway sidings, and works present within the central areas of the site, and a timber yard within the southern area of the Site. The railway sheds, works and associated infrastructure were demolished in the 1980s with much of the Site remaining as open unused land since that time.

The redevelopment of Barrow’s waterfront was a long-held ambition for Barrow Borough Council spanning more than two decades. Success has been realised through the completion of the Waterfront Business Park on Barrow Island, and the attraction of major offshore wind investors to the Port of Barrow, however, progress stalled on the major housing allocation following the 2008 recession and public spending austerity measures.

Realisation of this element will deliver significant change on the Site itself and deliver wider benefits in terms of investor confidence to the rest of the town. As such, it is a vital part of Barrow’s wider regeneration agenda. The project has come more sharply into focus with the development of Team Barrow and the ongoing discussions with Government around how the Town and wider geography can best support BAE Systems’ delivery of key defence infrastructure.

Significant progress has been made in the past two years in assembling the funding package required to address site complexities and unlock the potential for development. Significant funding was secured to allow the remediation works of Phase One of the Site to be successfully delivered.

This Tender concerns Phase Two of Marina Village. The Council wishes to appoint a design and build contractor to remediate the site to broadly the same standard as Phase 1 and to install some associated enabling infrastructure on the site to assist future housing suppliers to develop the site for 808 homes (Phase 1 and Phase 2 together). Please refer to the Scope for further information.

II.2.5) Meini prawf dyfarnu

Maen prawf isod:

Maes prawf ansawdd: Quality / Pwysoliad: 57.5

Maes prawf ansawdd: Finance / Pwysoliad: 2.5

Price / Pwysoliad:  40

II.2.6) Gwerth amcangyfrifedig

Gwerth heb gynnwys TAW: 16 000 000.00 GBP

II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig

Hyd mewn misoedd: 24

Gall y contract hwn gael ei adnewyddu: Na

II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd

II.2.10) Gwybodaeth am amrywiadau

Derbynnir amrywiadau: Na

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

II.2.14) Gwybodaeth ychwanegol

Suppliers wishing to express an interest and obtain access to the tender documents should

go to www.the-chest.org.uk and click on current opportunities from the navigation area on

the left of the screen. On the next screen enter the contract Reference (DN717053) in the

box labelled 'contains' then click search. Click on the blue link for the contract title to view

the opportunity. To express an interest you will need to login. if you are not already

registered on the www.the-chest.org.uk you will need to return to the home page and click

on Register. Register FREE link in the navigation area on the left of the screen. Registration is

free of charge and your username and password will be emailed to you.

Westmorland and Furness Council is fully supportive of all aspects of diversity including

ethnicity, race, religion, age, disability and sexual orientation. In this respect Westmorland

and Furness Council welcomes expressions of interest from ethnic minority, disabled and

other diverse business communities and the voluntary sector. Economic operators are

therefore required to fully comply with all statutory obligations/applicable legislation and

there will be a requirement to participate in the Authority's supplier audits on all aspects of

diversity.

The Contracting Authority expressly reserves the right:

(i) not to award any contract as a result of the procurement process commenced by

publication of this notice; and

(ii) to make whatever changes it may see fit to the content and structure of the tendering

competition; and in no circumstances will the Contracting Authority be liable for any costs

incurred by the candidates. If the Contracting Authority decides to enter into a Contract with

the successful supplier, this does not mean that there is any guarantee of subsequent

contracts being awarded. Any expenditure, work or effort undertaken prior to contract award

is accordingly a matter solely for the commercial judgement of potential suppliers. The

Contracting Authority reserve the right to use any electronic portal during the life of the

agreement. The value provided in Section II.1.5 is only an estimate. We cannot guarantee to suppliers any business through this contract. Under this procurement the contractor is required to actively participate in the economic and social regeneration of the locality and surrounding the place of delivery for the procurement. Accordingly contract performance conditions may relate in particular to social and environmental considerations.

Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol

III.1) Amodau ar gyfer cymryd rhan

III.1.2) Statws economaidd ac ariannol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.1.3) Gallu technegol a phroffesiynol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.2) Amodau sy’n gysylltiedig â’r contract

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law

Dyddiad: 01/05/2024

Amser lleol: 12:00

IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan

EN

IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr

Hyd mewn misoedd: 6  (o’r dyddiad a nodwyd i dendr ddod i law)

IV.2.7) Amodau ar gyfer agor tendrau

Dyddiad: 01/05/2024

Amser lleol: 12:00

Section VI: Gwybodaeth ategol

VI.1) Gwybodaeth am ailddigwydd

Caffaeliad cylchol yw hwn: Na

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

High Court of Justice

London

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

27/03/2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45000000 Gwaith adeiladu Adeiladu ac Eiddo Tiriog

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
procurement2@westmorlandandfurness.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.