Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad o Ddyfarnu Contract

ITT MILFORD HAVEN LOCK PONTOONS

  • Cyhoeddwyd gyntaf: 25 Mawrth 2024
  • Wedi'i addasu ddiwethaf: 25 Mawrth 2024

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-129373
Cyhoeddwyd gan:
Milford Haven Port Authority
ID Awudurdod:
AA1129
Dyddiad cyhoeddi:
25 Mawrth 2024
Dyddiad Cau:
-
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

MHPA has identified the two existing pontoons that are located in the entrance to Milford Dock lock are to be replaced. The existing pontoons and the guide rails that hold the pontoons in position are reported to operate poorly and require very frequent maintenance or repair, particularly to the guide rails and rollers. The primary function of the lock entrance pontoons is to provide temporary berthing to the vessels entering the dock while waiting for the lock to fill up to the required water level and the gates to open. The pontoons should allow for easy access for inspection, maintenance and repair of the pontoons themselves and the guide rails, which is not currently achieved. The project is intended to be funded by a Grant for UK Seafood Fund: Infrastructure (Round 2) and will only proceed on successful receipt of funding. REQUIREMENT The Port of Milford Haven invites you to submit a proposal for the following works: • Design and Build for Pontoons, guides, ladders and fixings and associated works Full details of the works to be provided can be found in Appendix 4, Annex 3 The tenderer shall submit the following details with their tender: • Pontoon drawings and specification • Details of pontoon guides and fixings • Any protective coatings or corrosion protection details • Outline method statement and risk assessments • Proposed Ground Investigations necessary to finalise the design of the fixings • Details of variation in design of the fixings, should the compressive strength of the lock wall be worse than anticipated in addition to the information required in Section 5. Full details of the works can be found in the full suite of documents via the SharePoint link below: https://mhpa.sharepoint.com/:f:/s/O365Tenders/EmEefjxqgFtHlEkDtUgNyuQBKhI9qSTOblOzI6oE5rlhlw?e=GR58bg

Testun llawn y rhybydd

HYSBYSIAD O DDYFARNU CONTRACT - CENEDLAETHOL

WORKS

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Milford Haven Port Authority

Gorsewood Drive, Milford Haven,

Pembrokeshire

SA73 3ER

UK

Caroline Thomas

+44 1646696100

caroline.thomas@mhpa.co.uk

2 Manylion y Contract

2.1

Teitl

ITT MILFORD HAVEN LOCK PONTOONS

2.2

Disgrifiad o'r contract

MHPA has identified the two existing pontoons that are located in the entrance to Milford Dock lock are to be replaced. The existing pontoons and the guide rails that hold the pontoons in position are reported to operate poorly and require very frequent maintenance or repair, particularly to the guide rails and rollers.

The primary function of the lock entrance pontoons is to provide temporary berthing to the vessels entering the dock while waiting for the lock to fill up to the required water level and the gates to open.

The pontoons should allow for easy access for inspection, maintenance and repair of the pontoons themselves and the guide rails, which is not currently achieved.

The project is intended to be funded by a Grant for UK Seafood Fund: Infrastructure (Round 2) and will only proceed on successful receipt of funding.

REQUIREMENT

The Port of Milford Haven invites you to submit a proposal for the following works:

• Design and Build for Pontoons, guides, ladders and fixings and associated works

Full details of the works to be provided can be found in Appendix 4, Annex 3

The tenderer shall submit the following details with their tender:

• Pontoon drawings and specification

• Details of pontoon guides and fixings

• Any protective coatings or corrosion protection details

• Outline method statement and risk assessments

• Proposed Ground Investigations necessary to finalise the design of the fixings

• Details of variation in design of the fixings, should the compressive strength of the lock wall be worse than anticipated

in addition to the information required in Section 5.

Full details of the works can be found in the full suite of documents via the SharePoint link below:

https://mhpa.sharepoint.com/:f:/s/O365Tenders/EmEefjxqgFtHlEkDtUgNyuQBKhI9qSTOblOzI6oE5rlhlw?e=GR58bg

2.3

Cod a Dosbarthiad yr Hysbysiad

45000000 Construction work
45244000 Marine construction works
70000000 Real estate services
71000000 Architectural, construction, engineering and inspection services
71200000 Architectural and related services
71300000 Engineering services
71500000 Construction-related services
93 Marine Energy Engineering Centre of Excellence (MEECE)
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)

2.4

Amcangyfrif o Gyfanswm Gwerth

3 Gweithdrefn

3.1

Math o Weithdrefn

Un cam

4 Dyfarnu Contract

4.1

Cynigwyr Llwyddiannus

4.1.1

Enw a Chyfeiriad y cyflenwr, contractwr neu ddarparwr gwasanaeth llwyddiannus





Walcon Marine

Walcon House, 3 Cockerell Close,

Fareham

PO155SR

UK




https://walconmarine.com

5 Gwybodaeth Arall

5.1

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

N/a

5.2

Dyddiad Dyfarnu'r Contract

  22 - 03 - 2024

5.3

Nifer y tendrau a dderbyniwyd

3

5.4

Gwybodaeth Arall

(WA Ref:140266)

5.5

Dogfennaeth Ychwanegol

Dd/g

5.6

Dyddiad cyhoeddi'r hysbysiad hwn:

  25 - 03 - 2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45000000 Gwaith adeiladu Adeiladu ac Eiddo Tiriog
45244000 Gwaith adeiladu morol Gwaith adeiladu ar gyfer prosiectau dwr
70000000 Gwasanaethau eiddo tiriog Adeiladu ac Eiddo Tiriog
71500000 Gwasanaethau goruchwylio safleoedd adeiladu Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio
71300000 Gwasanaethau peirianneg Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio
71200000 Gwasanaethau pensaernïol a gwasanaethau cysylltiedig Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio
71000000 Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio Adeiladu ac Eiddo Tiriog

Lleoliadau Dosbarthu

ID Disgrifiad
1014 De-orllewin Cymru (Sir Gaerfyrddin, Sir Benfro, Ceredigion)

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Teulu dogfennau

Manylion hysbysiad
Dyddiad cyhoeddi:
23 Chwefror 2023
Dyddiad Cau:
15 Mawrth 2023 00:00
Math o hysbysiad:
Hysbysiad o Gontract
Enw Awdurdod:
Milford Haven Port Authority
Dyddiad cyhoeddi:
25 Mawrth 2024
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Enw Awdurdod:
Milford Haven Port Authority

Ynglŷn â'r prynwr

Prif gyswllt:
caroline.thomas@mhpa.co.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.