Dyfarnu Contract

UKRI-3274 Professional Services for the Design, Project Management and Cost Management of HV/LV Infrastructure Project Works

  • Cyhoeddwyd gyntaf: 31 Gorffennaf 2024
  • Wedi'i addasu ddiwethaf: 31 Gorffennaf 2024
  • Cofnodi Diddordeb

     

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-04037e
Cyhoeddwyd gan:
UK Research and Innovation
ID Awudurdod:
AA70725
Dyddiad cyhoeddi:
31 Gorffennaf 2024
Dyddiad Cau:
-
Math o hysbysiad:
Dyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

UKRI-STFC Rutherford Appleton Laboratory site has 50 substations with a total demand of 24MW and c. 27km of HV cabling. Some of this infrastructure is original circa 60 years old.

STFC have identified a substantial maintenance backlog list, which forms the focus of the request for the support of a specialist HV/LV Design Consultancy, with large, complexed site Infrastructure design experience. The list is comprised of a large variety of interventions to the electrical infrastructure such as cable overlays for capacity, replacements for service life, and remedial works following faults on the network.

There is a clear need for a long-term infrastructure masterplan to address this deficit. At this time, we understand that planning the maintenance work should be mindful to the need for a masterplan. The supplier is to be capable to design and deliver Infrastructure Master planning especially where we are making significant investment into the existing infrastructure.

https://www.ukri.org/who-we-are/procurement-contract-transparency-data/

Testun llawn y rhybydd

Hysbysiad dyfarnu contract

Canlyniadau'r weithdrefn gaffael

Adran I: Endid contractio

I.1) Enw a chyfeiriad

UK Research and Innovation

Polaris House, North Star Avenue

Swindon

SN2 2FL

UK

Ffôn: +44 1793442000

E-bost: STFCprocurement@ukri.org

NUTS: UKK14

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: www.ukri.org

I.2) Caffael ar y cyd

Caiff y contract ei ddyfarnu gan gorff prynu canolog

I.4) Y math o awdurdod contractio

Corff a lywodraethir gan gyfraith gyhoeddus

I.5) Prif weithgaredd

Arall: research and innovation

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

UKRI-3274 Professional Services for the Design, Project Management and Cost Management of HV/LV Infrastructure Project Works

Cyfeirnod: UKRI-3274

II.1.2) Prif god CPV

71244000

 

II.1.3) Y math o gontract

Gwasanaethau

II.1.4) Disgrifiad byr

UKRI-STFC Rutherford Appleton Laboratory site has 50 substations with a total demand of 24MW and c. 27km of HV cabling. Some of this infrastructure is original circa 60 years old.

STFC have identified a substantial maintenance backlog list, which forms the focus of the request for the support of a specialist HV/LV Design Consultancy, with large, complexed site Infrastructure design experience. The list is comprised of a large variety of interventions to the electrical infrastructure such as cable overlays for capacity, replacements for service life, and remedial works following faults on the network.

There is a clear need for a long-term infrastructure masterplan to address this deficit. At this time, we understand that planning the maintenance work should be mindful to the need for a masterplan. The supplier is to be capable to design and deliver Infrastructure Master planning especially where we are making significant investment into the existing infrastructure.

https://www.ukri.org/who-we-are/procurement-contract-transparency-data/

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.1.7) Cyfanswm gwerth y caffaeliad

Gwerth heb gynnwys TAW: 950 000.00 GBP

II.2) Disgrifiad

II.2.3) Man cyflawni

Cod NUTS:

UKJ14


Prif safle neu fan cyflawni:

Oxfordshire

II.2.4) Disgrifiad o’r caffaeliad

The maintenance backlog is currently listed by task (See Appendix D in the tender documents). A critical activity is to initially develop the list into design packages that are appropriate to be delivered on site. For example, multiple tasks in a single building might be appropriate to be delivered as a single design package that is delivered across several phases. Or tasks might remain as single activities.

An in-depth understanding the of the task list, site and priorities is required to allow for development and delivery of the design and construction packages. We propose a ‘Discovery Phase’ to develop this understanding

We are looking to contract with specialist supplier who has Technical, Design, Programming and Project Management capability to deliver the following services to support the implementation of the backlog.

•Programme Management Office

•Project Management

•Contract Procurement and Contract Administration

•Cost Management

•Electrical Design

•Civil Design

Other services that may be required, and can also be provided by the supplier include:

•Architecture, and Infrastructure Master planning – for example, if new substations are required.

•Landscape and Ecology – to support with any planning applications should they be required.

•Fire Engineering – If permanent or temporary changes are required to the fire strategy because of the works.

These works are across a complexed portfolio of buildings including laboratories, workshops, offices, support facilities, assembly halls etc.

This appointment will be up to a 4-year period, On a 2+1+1 Term. Over the next 4 years, we have been granted funding to address the maintenance backlog which, is circa £2-3 million pa.

The core requirement of the Discovery Phase is estimated of up to £100,000.00 GBP ex VAT. Any work via this Contract beyond the core requirement shall be a ‘call-off’, meaning that there is no guaranteed level of spend beyond the core requirement. Once a Contract is established with a preferred Bidder orders shall be made when UKRI identify the need UKRI shall request a quote from the supplier. If UKRI wish to proceed, a PO will be issued for the defined project/requirement. Multiple Orders may be issued throughout the Contract duration and up to the maximum Contract value. The anticipated fee for these works across the full potential 4-year terms is £950,000.00

https://www.ukri.org/who-we-are/procurement-contract-transparency-data/

II.2.5) Meini prawf dyfarnu

Price

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Ydy

Disgrifiad o’r opsiynau:

The option of extending the contract to a 3rd and 4th year, released indivdually.

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon

Rhif yr hysbysiad yn OJ S:

2023/S 000-028232

Section V: Dyfarnu contract

Rhif Contract: UKRI-3274

Dyfernir contract/lot: Ydy

V.2 Dyfarnu contract

V.2.1) Y dyddiad y daeth y contract i ben

09/01/2024

V.2.2) Gwybodaeth am dendrau

Nifer y tendrau a ddaeth i law: 8

Dyfarnwyd y contract i gr?p o weithredwyr economaidd: Na

V.2.3) Enw a chyfeiriad y contractwr

WSP UK Limited

01383511

WSP House

London

WC2A 1AF

UK

NUTS: UKI

BBaCh yw’r contractwr: Na

V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)

Amcangyfrif cychwynnol o gyfanswm gwerth y contract/lot: 950 000.00 GBP

Cyfanswm gwerth y contract/lot: 950 000.00 GBP

V.2.5) Gwybodaeth am is-gontractio

Section VI: Gwybodaeth ategol

VI.3) Gwybodaeth ychwanegol

The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.

To view this notice, please click here:

https://ukri.delta-esourcing.com/delta/viewNotice.html?noticeId=879170119

GO Reference: GO-2024730-PRO-27088454

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

UK Research & Innovation

Science & Technology Facilities Council, Rutherford Appleton Laboratory, Harwell

Oxford

OX11 0QX

UK

Ffôn: +44 1235446553

VI.5) Dyddiad anfon yr hysbysiad hwn

30/07/2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
71244000 Cyfrifo costau, monitro costau Gwasanaethau pensaernïol, peirianneg a chynllunio

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
STFCprocurement@ukri.org
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.