Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad o Ddyfarnu Contract

Ysgol Bro Aled - Low Carbon Heating Replacement 2024

  • Cyhoeddwyd gyntaf: 10 Gorffennaf 2024
  • Wedi'i addasu ddiwethaf: 10 Gorffennaf 2024

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-141616
Cyhoeddwyd gan:
Conwy County Borough Council
ID Awudurdod:
AA0389
Dyddiad cyhoeddi:
10 Gorffennaf 2024
Dyddiad Cau:
-
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

These works were for decarbonisation heating and hot water scheme within the school building to replace existing oil heating system with low carbon Air Source Heat Pumps. Installation of Mechanical Ventilation Heat Recovery units within classrooms to provide ventilation to these spaces. Upgrade of electrical supply to the school and associated electrical works to support the decarbonisation scheme. Works (by others - SP Energy Networks) were to be undertake excavations for the cable installation have been booked for 19/08/2024 with the cable to be installed 23/08/2024. Access to the school yard and switch room would be required at the latter end of this week to install the cable in the playground and into the building. The transformer was to be upgraded and all power to the village and surrounding area will be switched off on 29/08/2024. This would when the cable will be connected and made live. All supplies would be transferred over after this date. (Should these dates have changed for whatever reason, Tenderers would have been notified)

Testun llawn y rhybydd

HYSBYSIAD O DDYFARNU CONTRACT - CENEDLAETHOL

WORKS

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Conwy County Borough Council

Environment, Roads & Facilities, Bodlondeb, Bangor Road,

Conwy

LL32 8DU

UK

Thomas Ashton

+44 1492574000

thomas.ashton@conwy.gov.uk

http://www.conwy.gov.uk

2 Manylion y Contract

2.1

Teitl

Ysgol Bro Aled - Low Carbon Heating Replacement 2024

2.2

Disgrifiad o'r contract

These works were for decarbonisation heating and hot water scheme within the school building to replace existing oil heating system with low carbon Air Source Heat Pumps.

Installation of Mechanical Ventilation Heat Recovery units within classrooms to provide ventilation to these spaces.

Upgrade of electrical supply to the school and associated electrical works to support the decarbonisation scheme.

Works (by others - SP Energy Networks) were to be undertake excavations for the cable installation have been booked for 19/08/2024 with the cable to be installed 23/08/2024. Access to the school yard and switch room would be required at the latter end of this week to install the cable in the playground and into the building. The transformer was to be upgraded and all power to the village and surrounding area will be switched off on 29/08/2024. This would when the cable will be connected and made live. All supplies would be transferred over after this date. (Should these dates have changed for whatever reason, Tenderers would have been notified)

2.3

Cod a Dosbarthiad yr Hysbysiad

45310000 Electrical installation work
45311000 Electrical wiring and fitting work
45315000 Electrical installation work of heating and other electrical building-equipment
45330000 Plumbing and sanitary works
45331000 Heating, ventilation and air-conditioning installation work
45331100 Central-heating installation work
45331110 Boiler installation work
45331210 Ventilation installation work
45331220 Air-conditioning installation work
45350000 Mechanical installations
1013 Conwy and Denbighshire

2.4

Amcangyfrif o Gyfanswm Gwerth

3 Gweithdrefn

3.1

Math o Weithdrefn

Un cam

4 Dyfarnu Contract

4.1

Cynigwyr Llwyddiannus

4.1.1

Enw a Chyfeiriad y cyflenwr, contractwr neu ddarparwr gwasanaeth llwyddiannus





Khs Mechanical Ltd

Unit 4A, Station Business Park, Pensarn,

Abergele

LL227PX

UK




5 Gwybodaeth Arall

5.1

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

N/a

5.2

Dyddiad Dyfarnu'r Contract

  10 - 07 - 2024

5.3

Nifer y tendrau a dderbyniwyd

6

5.4

Gwybodaeth Arall

(WA Ref:142914)

5.5

Dogfennaeth Ychwanegol

Dd/g

5.6

Dyddiad cyhoeddi'r hysbysiad hwn:

  10 - 07 - 2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45331110 Gwaith gosod boeleri Gwaith gosod systemau gwresogi, awyru ac aerdymheru
45331100 Gwaith gosod gwres canolog Gwaith gosod systemau gwresogi, awyru ac aerdymheru
45350000 Gwaith gosod mecanyddol Gwaith gosod ar gyfer adeiladau
45331220 Gwaith gosod systemau aerdymheru Gwaith gosod systemau gwresogi, awyru ac aerdymheru
45331210 Gwaith gosod systemau awyru Gwaith gosod systemau gwresogi, awyru ac aerdymheru
45331000 Gwaith gosod systemau gwresogi, awyru ac aerdymheru Gwaith plymwr a gwaith glanweithiol
45310000 Gwaith gosod trydanol Gwaith gosod ar gyfer adeiladau
45315000 Gwaith gosod trydanol ar gyfer cyfarpar gwresogi a chyfarpar adeiladu trydanol arall Gwaith gosod trydanol
45311000 Gwaith gwifro a ffitio trydanol Gwaith gosod trydanol
45330000 Gwaith plymwr a gwaith glanweithiol Gwaith gosod ar gyfer adeiladau

Lleoliadau Dosbarthu

ID Disgrifiad
1013 Conwy a Sir Ddinbych

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Teulu dogfennau

Manylion hysbysiad
Dyddiad cyhoeddi:
22 Mai 2024
Dyddiad Cau:
20 Mehefin 2024 00:00
Math o hysbysiad:
Hysbysiad o Gontract
Enw Awdurdod:
Conwy County Borough Council
Dyddiad cyhoeddi:
10 Gorffennaf 2024
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Enw Awdurdod:
Conwy County Borough Council

Ynglŷn â'r prynwr

Prif gyswllt:
thomas.ashton@conwy.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.