Hysbysiad gwybodaeth ymlaen llaw
Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Transport for Wales
3 Llys Cadwyn, Taff Street
Pontypridd
CF37 4TH
UK
Ffôn: +44 2921673434
E-bost: Procurement@tfw.wales
NUTS: UKL
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://tfw.wales
Cyfeiriad proffil y prynwr: https://www.sell2wales.gov.wales/search/Search_AuthProfile.aspx?ID=AA50685
I.3) Cyfathrebu
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
I.4) Y math o awdurdod contractio
Corff a lywodraethir gan gyfraith gyhoeddus
I.5) Prif weithgaredd
Arall: Transport
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Core Valley Lines (CVL) Ancillary Track Works
Cyfeirnod: C001136.00
II.1.2) Prif god CPV
45234100
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Track improvement works associated with the installation of Overhead Power and increased train frequencies on the Core Valley Lines (CVL). Additional construction track works to complete the overall scope of the project on the Cardiff and Merthyr (CAM) lines, City Lines (CTL), Rhymney Line (RHY) and on the Cardiff Bay Line (BAY). These works include:
Achievement of level boarding at platforms
Replacement of existing buffer stops
Re-ballast and rerail
Track Lowers
Track realignment and line speed improvements
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 3 500 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
34946000
34631200
II.2.3) Man cyflawni
Cod NUTS:
UKL
Prif safle neu fan cyflawni:
Cardiff and Merthyr (CAM) lines, City Lines (CTL), Rhymney Line (RHY) and on the Cardiff Bay Line (BAY).
II.2.4) Disgrifiad o’r caffaeliad
As part of the track improvement works associated with the installation of Overhead Power and increased train frequencies on the Core Valley Lines (CVL), there is a requirement to provide additional track works to complete the overall scope of the project.
There is a specific requirement to construct track works on the Cardiff and Merthyr (CAM) lines, City Lines (CTL), Rhymney Line (RHY) and on the Cardiff Bay Line (BAY). These works include.
Achievement of level boarding at platforms
Replacement of existing buffer stops
Re-ballast and rerail
Track Lowers
Track realignment and line speed improvements
TfW's appointed designer Amey, will complete the design of all schemes. TfW will provide rail haulage for the works.
The Authority is calling for expressions of interest to be received no later than: 31/01/25.
Subject to sufficient interest, the Authority may place a further notice calling for competition. Form of contract applicable would be NEC 4 Option A (Fixed Price).
Estimated timescales: The contract period would be 02/06/25 - 31/12/26.
II.2.14) Gwybodaeth ychwanegol
TfW will have provisionally secured track access and train haulage for early works, which may cause potential constraints. Other improvement works will be underway on the CVL network and the successful supplier would be required to work alongside existing contractors. The interface with other contractors will be managed by TfW.
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
02/06/2025
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
Expressions of Interest are to be submitted by the 31/01/25. Should there be sufficient expressions of interest received, the indicative timetable may apply. The Authority reserves the right to amend the timetable if needed:
Tender Issue: 03/03/25
Tender Return: 15/04/25
Anticipated Award: 02/06/25
NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at http://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=146522.
(WA Ref:146522)
VI.5) Dyddiad anfon yr hysbysiad hwn
19/12/2024