Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Network Rail Infrastructure Ltd
02904587
Waterloo General Offices
London
SE1 8SW
UK
Person cyswllt: Naomi Nortey
Ffôn: +44 1908781000
E-bost: DRTSProcurement@networkrail.co.uk
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: www.networkrail.co.uk
Cyfeiriad proffil y prynwr: https://networkrail.bravosolution.co.uk/web/login.html
I.6) Prif weithgaredd
Gwasanaethau rheilffyrdd
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Target 190plus Synthetic Environment for the Design & Test of Signalling Solutions (Phase 2 & 3)
Cyfeirnod: 35768
II.1.2) Prif god CPV
72212517
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
Network Rail (NR) requires a digital solution to develop signalling
scheme designs and facilitate the integration of that design into the
operational railway providing interfaces to a target signalling
system.
The Target 190plus Synthetic Environment (SE) is a significant
Research & Development project that will define, develop and
deliver capabilities that will enable efficient design, integration,
testing, and validation of Future Control Command Signalling (FCCS) schemes and
products.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: / Y cynnig uchaf:
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
72212140
72212321
72212517
72262000
72317000
II.2.3) Man cyflawni
Cod NUTS:
UK
II.2.4) Disgrifiad o’r caffaeliad
The railway faces a major industry challenge, where the cost and volume of future signalling renewals is unsustainable. Over the next 15 years there is a need to deliver an increase of over 50% of the signalling renewals work at half the current price to achieve a sustainable, affordable railway that can meet customer needs and expectations.
Britain must have a reliable, high performing railway that’s fit for the future, delivers financial value and provides operational performance in a safe and sustainable way. To reduce costs and increase access on the railway we are creating new ways of working and introducing new technology. The use of digital technology will improve the services to freight and passenger customers, causing less delays due to signalling failure and track closures for access to complete repairs and providing the opportunity for more trains to run where needed.
We’re working across Industry to build a new approach for balancing research and development and engineering solutions with the needs of end users and customers.
Target 190plus is a Network Rail Research & Development (R&D) programme that looks at the sustainability of the signalling systems on the network and the challenges these bring to the rail industry. It has the aim to reduce the current whole life cost of signalling from a unit rate of £419,000 to the required £190,000 by 2029 to enable the ETCS Long Term Deployment Plan to be achieved.
Synthetic Environment is 1 of 29 projects, the programme will use to reduce costs, improve services for passengers and increase safety by automating signalling design processes, standardising system architectures, implementing faster renewals planning and introducing offsite testing and validation processes.
Synthetic Environment Phase 1: concerned the development of detailed requirements for the SE, completed.
This procurement event will seek a suitable supplier to deliver Phase 2 and 3 of the
Synthetic Environment Project:
Phase 2: Development of a Minimum Viable Product (MVP) for SE and shadow mode running
Phase 3: Full SE capable of delivering all the foreseen technology
and scope options for F-CCS projects
Detailed requirements within the published tender documents.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
negodi gyda galwad am gystadleuaeth
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2023/S 000-021503
Section V: Dyfarnu contract
Teitl: Target 190plus Synthetic Environment for the Design & Test of Signalling Solutions (Phase 2 & 3)
Dyfernir contract/lot:
Na
V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
The High Court of England and Wales
London
UK
VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu
The High Court of England and Wales
The Strand
London
WC2A 2LL
UK
VI.4.3) Gweithdrefn adolygu
Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:
In accordance with the Utilities Contracts Regulations 2016, Network Rail will incorporate a minimum 10 calendar day standstill period prior to concluding the award of any framework contracts pursuant to this notice.
VI.5) Dyddiad anfon yr hysbysiad hwn
07/08/2024