Hysbysiad gwybodaeth ymlaen llaw
Hysbysiad gwybodaeth ymlaen llaw yn unig yw hwn
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Natural Resources Wales
Ty Cambria House, 29 Newport Road
Cardiff
CF24 0TP
UK
Ffôn: +44 3000653000
E-bost: procurement.enquiries@cyfoethnaturiolcymru.gov.uk
NUTS: UKL
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://naturalresourceswales.gov.uk
Cyfeiriad proffil y prynwr: https://www.sell2wales.gov.wales/search/Search_AuthProfile.aspx?ID=AA0110
I.2) Caffael ar y cyd
Caiff y contract ei ddyfarnu gan gorff prynu canolog
I.3) Cyfathrebu
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Mae cyfathrebu electronig yn gofyn am ddefnyddio offer a dyfeisiau nad ydynt ar gael yn gyffredinol. Mae mynediad uniongyrchol anghyfgyfyngiedig a llawn i'r offer a dyfeisiau hyn yn bosibl, yn rhad ac am ddim, yn:
https://etenderwales.bravosolution.co.uk
I.4) Y math o awdurdod contractio
Arall: Government Sponsored Body
I.5) Prif weithgaredd
Yr Amgylchedd
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
NRW Afan Valley MTB Trails 2024 – Energy & Jetlag
Cyfeirnod: 55858
II.1.2) Prif god CPV
45236290
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Afan Forest Park is made up of several authorised mountain bike and walking trails that attracts a large number of visitors from around the UK every year. This infrastructure has been in place since 2001 and overtime has degraded. This project will provide an opportunity to redesign and improve the red graded White’s Level Mountain bike trail ‘boardwalk’ section of ‘Energy’, which is a popular part of this 15.5.km route that offers riders a challenging and technical riding experience.
The project therefore consists of two distinct parts:
- replace the ‘boardwalk’ section of ‘Energy’ with a more durable material, this is likley to involve some minor redesign of some of the boardwalk locations
- improve and enhance the ‘Jetlag’, 1,770-meter final descent trail section of the Skyline Mountain bike route
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKL17
Prif safle neu fan cyflawni:
Afan Forest Park
II.2.4) Disgrifiad o’r caffaeliad
The project therefore consists of two distinct parts:
- replace the ‘boardwalk’ section of ‘Energy’ with a more durable material, this is likley to involve some minor redesign of some of the boardwalk locations
- improve and enhance the ‘Jetlag’, 1,770-meter final descent trail section of the Skyline Mountain bike route
II.3) Dyddiad amcangyfrifedig ar gyfer cyhoeddi’r hysbysiad contract:
03/06/2024
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at http://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=140534.
(WA Ref:140534)
VI.5) Dyddiad anfon yr hysbysiad hwn
08/04/2024